Sync to HEAD
[bpt/emacs.git] / lisp / calendar / cal-china.el
CommitLineData
3afbc435 1;;; cal-china.el --- calendar functions for the Chinese calendar
0808d911 2
a96a5fca 3;; Copyright (C) 1995, 1997 Free Software Foundation, Inc.
0808d911
ER
4
5;; Author: Edward M. Reingold <reingold@cs.uiuc.edu>
6;; Keywords: calendar
7;; Human-Keywords: Chinese calendar, calendar, holidays, diary
8
9;; This file is part of GNU Emacs.
10
11;; GNU Emacs is free software; you can redistribute it and/or modify
12;; it under the terms of the GNU General Public License as published by
13;; the Free Software Foundation; either version 2, or (at your option)
14;; any later version.
15
16;; GNU Emacs is distributed in the hope that it will be useful,
17;; but WITHOUT ANY WARRANTY; without even the implied warranty of
18;; MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the
19;; GNU General Public License for more details.
20
21;; You should have received a copy of the GNU General Public License
b578f267
EN
22;; along with GNU Emacs; see the file COPYING. If not, write to the
23;; Free Software Foundation, Inc., 59 Temple Place - Suite 330,
24;; Boston, MA 02111-1307, USA.
0808d911
ER
25
26;;; Commentary:
27
28;; This collection of functions implements the features of calendar.el,
0031509c
ER
29;; diary.el, and holidays.el that deal with the Chinese calendar. The rules
30;; used for the Chinese calendar are those of Baolin Liu (see L. E. Doggett's
31;; article "Calendars" in the Explanatory Supplement to the Astronomical
32;; Almanac, second edition, 1992) for the calendar as revised at the beginning
67d80173
ER
33;; of the Qing dynasty in 1644. The nature of the astronomical calculations
34;; is such that precise calculations cannot be made without great expense in
35;; time, so that the calendars produced may not agree perfectly with published
36;; tables--but no two pairs of published tables agree perfectly either! Liu's
37;; rules produce a calendar for 2033 which is not accepted by all authorities.
38;; The date of Chinese New Year is correct from 1644-2051.
0031509c 39
a96a5fca
PE
40;; Technical details of all the calendrical calculations can be found in
41;; ``Calendrical Calculations'' by Nachum Dershowitz and Edward M. Reingold,
42;; Cambridge University Press (1997).
43
0031509c 44;; Comments, corrections, and improvements should be sent to
0808d911
ER
45;; Edward M. Reingold Department of Computer Science
46;; (217) 333-6733 University of Illinois at Urbana-Champaign
47;; reingold@cs.uiuc.edu 1304 West Springfield Avenue
48;; Urbana, Illinois 61801
49
50;;; Code:
51
0b0f8fa4
GM
52(defvar displayed-month)
53(defvar displayed-year)
54
0808d911
ER
55(require 'lunar)
56
0808d911
ER
57(defvar chinese-calendar-celestial-stem
58 ["Jia" "Yi" "Bing" "Ding" "Wu" "Ji" "Geng" "Xin" "Ren" "Gui"])
59
00e3e480
ER
60(defvar chinese-calendar-terrestrial-branch
61 ["Zi" "Chou" "Yin" "Mao" "Chen" "Si" "Wu" "Wei" "Shen" "You" "Xu" "Hai"])
62
a1506d29 63(defcustom chinese-calendar-time-zone
0808d911
ER
64 '(if (< year 1928)
65 (+ 465 (/ 40.0 60.0))
66 480)
67 "*Number of minutes difference between local standard time for Chinese
68calendar and Coordinated Universal (Greenwich) Time. Default is for Beijing.
69This is an expression in `year' since it changed at 1928-01-01 00:00:00 from
8db540c5 70UT+7:45:40 to UT+8."
9e935048 71 :type 'sexp
8db540c5 72 :group 'chinese-calendar)
0808d911 73
8db540c5
RS
74(defcustom chinese-calendar-location-name "Beijing"
75 "*Name of location used for calculation of Chinese calendar."
76 :type 'string
77 :group 'chinese-calendar)
0808d911 78
8db540c5 79(defcustom chinese-calendar-daylight-time-offset 0
00e3e480
ER
80; The correct value is as follows, but the Chinese calendrical
81; authorities do NOT use DST in determining astronomical events:
82; 60
0808d911 83 "*Number of minutes difference between daylight savings and standard time
8db540c5
RS
84for Chinese calendar. Default is for no daylight savings time."
85 :type 'integer
86 :group 'chinese-calendar)
0808d911 87
8db540c5 88(defcustom chinese-calendar-standard-time-zone-name
0808d911
ER
89 '(if (< year 1928)
90 "PMT"
91 "CST")
9e935048
RS
92 "*Abbreviated name of standard time zone used for Chinese calendar.
93This is an expression depending on `year' because it changed
94at 1928-01-01 00:00:00 from `PMT' to `CST'."
95 :type 'sexp
8db540c5 96 :group 'chinese-calendar)
0808d911 97
8db540c5
RS
98(defcustom chinese-calendar-daylight-time-zone-name "CDT"
99 "*Abbreviated name of daylight-savings time zone used for Chinese calendar."
100 :type 'string
101 :group 'chinese-calendar)
0808d911 102
8db540c5 103(defcustom chinese-calendar-daylight-savings-starts nil
00e3e480
ER
104; The correct value is as follows, but the Chinese calendrical
105; authorities do NOT use DST in determining astronomical events:
106; '(cond ((< 1986 year) (calendar-nth-named-day 1 0 4 year 10))
107; ((= 1986 year) '(5 4 1986))
108; (t nil))
0808d911 109 "*Sexp giving the date on which daylight savings time starts for Chinese
00e3e480 110calendar. Default is for no daylight savings time. See documentation of
8db540c5
RS
111`calendar-daylight-savings-starts'."
112 :type 'sexp
113 :group 'chinese-calendar)
0808d911 114
8db540c5 115(defcustom chinese-calendar-daylight-savings-ends nil
00e3e480
ER
116; The correct value is as follows, but the Chinese calendrical
117; authorities do NOT use DST in determining astronomical events:
118; '(if (<= 1986 year) (calendar-nth-named-day 1 0 9 year 11))
0808d911 119 "*Sexp giving the date on which daylight savings time ends for Chinese
00e3e480 120calendar. Default is for no daylight savings time. See documentation of
8db540c5
RS
121`calendar-daylight-savings-ends'."
122 :type 'sexp
123 :group 'chinese-calendar)
0808d911 124
8db540c5 125(defcustom chinese-calendar-daylight-savings-starts-time 0
0808d911 126 "*Number of minutes after midnight that daylight savings time starts for
8db540c5
RS
127Chinese calendar. Default is for no daylight savings time."
128 :type 'integer
129 :group 'chinese-calendar)
0808d911 130
8db540c5 131(defcustom chinese-calendar-daylight-savings-ends-time 0
0808d911 132 "*Number of minutes after midnight that daylight savings time ends for
8db540c5
RS
133Chinese calendar. Default is for no daylight savings time."
134 :type 'integer
135 :group 'chinese-calendar)
0808d911
ER
136
137(defun chinese-zodiac-sign-on-or-after (d)
138 "Absolute date of first new Zodiac sign on or after absolute date d.
139The Zodiac signs begin when the sun's longitude is a multiple of 30 degrees."
140 (let* ((year (extract-calendar-year
0031509c 141 (calendar-gregorian-from-absolute d)))
0808d911
ER
142 (calendar-time-zone (eval chinese-calendar-time-zone))
143 (calendar-daylight-time-offset
144 chinese-calendar-daylight-time-offset)
145 (calendar-standard-time-zone-name
146 chinese-calendar-standard-time-zone-name)
147 (calendar-daylight-time-zone-name
148 chinese-calendar-daylight-time-zone-name)
149 (calendar-calendar-daylight-savings-starts
150 chinese-calendar-daylight-savings-starts)
151 (calendar-daylight-savings-ends
152 chinese-calendar-daylight-savings-ends)
153 (calendar-daylight-savings-starts-time
154 chinese-calendar-daylight-savings-starts-time)
155 (calendar-daylight-savings-ends-time
156 chinese-calendar-daylight-savings-ends-time))
157 (floor
158 (calendar-absolute-from-astro
159 (solar-date-next-longitude
160 (calendar-astro-from-absolute d)
161 30)))))
162
163(defun chinese-new-moon-on-or-after (d)
164 "Absolute date of first new moon on or after absolute date d."
165 (let* ((year (extract-calendar-year
166 (calendar-gregorian-from-absolute d)))
167 (calendar-time-zone (eval chinese-calendar-time-zone))
168 (calendar-daylight-time-offset
169 chinese-calendar-daylight-time-offset)
170 (calendar-standard-time-zone-name
171 chinese-calendar-standard-time-zone-name)
172 (calendar-daylight-time-zone-name
173 chinese-calendar-daylight-time-zone-name)
174 (calendar-calendar-daylight-savings-starts
175 chinese-calendar-daylight-savings-starts)
176 (calendar-daylight-savings-ends
177 chinese-calendar-daylight-savings-ends)
178 (calendar-daylight-savings-starts-time
179 chinese-calendar-daylight-savings-starts-time)
180 (calendar-daylight-savings-ends-time
181 chinese-calendar-daylight-savings-ends-time))
182 (floor
183 (calendar-absolute-from-astro
184 (lunar-new-moon-on-or-after
185 (calendar-astro-from-absolute d))))))
186
0031509c 187(defvar chinese-year-cache
6bd677fa 188 '((1990 (12 726464) (1 726494) (2 726523) (3 726553) (4 726582) (5 726611)
00e3e480
ER
189 (5.5 726641) (6 726670) (7 726699) (8 726729) (9 726758) (10 726788)
190 (11 726818))
191 (1991 (12 726848) (1 726878) (2 726907) (3 726937) (4 726966) (5 726995)
192 (6 727025) (7 727054) (8 727083) (9 727113) (10 727142) (11 727172))
193 (1992 (12 727202) (1 727232) (2 727261) (3 727291) (4 727321) (5 727350)
194 (6 727379) (7 727409) (8 727438) (9 727467) (10 727497) (11 727526))
195 (1993 (12 727556) (1 727586) (2 727615) (3 727645) (3.5 727675) (4 727704)
196 (5 727734) (6 727763) (7 727793) (8 727822) (9 727851) (10 727881)
197 (11 727910))
198 (1994 (12 727940) (1 727969) (2 727999) (3 728029) (4 728059) (5 728088)
199 (6 728118) (7 728147) (8 728177) (9 728206) (10 728235) (11 728265))
200 (1995 (12 728294) (1 728324) (2 728353) (3 728383) (4 728413) (5 728442)
201 (6 728472) (7 728501) (8 728531) (8.5 728561) (9 728590) (10 728619)
202 (11 728649))
203 (1996 (12 728678) (1 728708) (2 728737) (3 728767) (4 728796) (5 728826)
204 (6 728856) (7 728885) (8 728915) (9 728944) (10 728974) (11 729004))
205 (1997 (12 729033) (1 729062) (2 729092) (3 729121) (4 729151) (5 729180)
206 (6 729210) (7 729239) (8 729269) (9 729299) (10 729328) (11 729358))
207 (1998 (12 729388) (1 729417) (2 729447) (3 729476) (4 729505) (5 729535)
208 (5.5 729564) (6 729593) (7 729623) (8 729653) (9 729682) (10 729712)
209 (11 729742))
210 (1999 (12 729771) (1 729801) (2 729831) (3 729860) (4 729889) (5 729919)
211 (6 729948) (7 729977) (8 730007) (9 730036) (10 730066) (11 730096))
212 (2000 (12 730126) (1 730155) (2 730185) (3 730215) (4 730244) (5 730273)
6bd677fa
KH
213 (6 730303) (7 730332) (8 730361) (9 730391) (10 730420) (11 730450))
214 (2001 (12 730480) (1 730509) (2 730539) (3 730569) (4 730598) (4.5 730628)
215 (5 730657) (6 730687) (7 730716) (8 730745) (9 730775) (10 730804)
216 (11 730834))
217 (2002 (12 730863) (1 730893) (2 730923) (3 730953) (4 730982) (5 731012)
218 (6 731041) (7 731071) (8 731100) (9 731129) (10 731159) (11 731188))
219 (2003 (12 731218) (1 731247) (2 731277) (3 731307) (4 731336) (5 731366)
220 (6 731396) (7 731425) (8 731455) (9 731484) (10 731513) (11 731543))
221 (2004 (12 731572) (1 731602) (2 731631) (2.5 731661) (3 731690) (4 731720)
222 (5 731750) (6 731779) (7 731809) (8 731838) (9 731868) (10 731897)
223 (11 731927))
224 (2005 (12 731956) (1 731986) (2 732015) (3 732045) (4 732074) (5 732104)
225 (6 732133) (7 732163) (8 732193) (9 732222) (10 732252) (11 732281))
226 (2006 (12 732311) (1 732340) (2 732370) (3 732399) (4 732429) (5 732458)
227 (6 732488) (7 732517) (7.5 732547) (8 732576) (9 732606) (10 732636)
228 (11 732665))
229 (2007 (12 732695) (1 732725) (2 732754) (3 732783) (4 732813) (5 732842)
230 (6 732871) (7 732901) (8 732930) (9 732960) (10 732990) (11 733020))
231 (2008 (12 733049) (1 733079) (2 733109) (3 733138) (4 733167) (5 733197)
232 (6 733226) (7 733255) (8 733285) (9 733314) (10 733344) (11 733374))
233 (2009 (12 733403) (1 733433) (2 733463) (3 733493) (4 733522) (5 733551)
234 (5.5 733581) (6 733610) (7 733639) (8 733669) (9 733698) (10 733728)
235 (11 733757))
236 (2010 (12 733787) (1 733817) (2 733847) (3 733876) (4 733906) (5 733935)
237 (6 733965) (7 733994) (8 734023) (9 734053) (10 734082) (11 734112)))
0031509c
ER
238 "An assoc list of Chinese year structures as determined by `chinese-year'.
239
240Values are computed as needed, but to save time, the initial value consists
6bd677fa
KH
241of the precomputed years 1990-2010. The code works just as well with this
242set to nil initially (which is how the value for 1990-2010 was computed).")
0031509c
ER
243
244(defun chinese-year (y)
245 "The structure of the Chinese year for Gregorian year Y.
00e3e480 246The result is a list of pairs (i d), where month i begins on absolute date d,
0031509c
ER
247of the Chinese months from the Chinese month following the solstice in
248Gregorian year Y-1 to the Chinese month of the solstice of Gregorian year Y.
249
250The list is cached for further use."
251 (let ((list (cdr (assoc y chinese-year-cache))))
252 (if (not list)
253 (progn
254 (setq list (compute-chinese-year y))
255 (setq chinese-year-cache
00e3e480 256 (append chinese-year-cache (list (cons y list))))))
0031509c
ER
257 list))
258
67d80173 259(defun number-chinese-months (list start)
0031509c 260 "Assign month numbers to the lunar months in LIST, starting with START.
67d80173
ER
261Numbers are assigned sequentially, START, START+1, ..., 11, with half
262numbers used for leap months.
0031509c 263
67d80173 264First month of list will never be a leap month, nor will the last."
0031509c 265 (if list
67d80173
ER
266 (if (zerop (- 12 start (length list)))
267 ;; List is too short for a leap month
00e3e480 268 (cons (list start (car list))
67d80173 269 (number-chinese-months (cdr list) (1+ start)))
0031509c 270 (cons
67d80173 271 ;; First month
00e3e480 272 (list start (car list))
67d80173 273 ;; Remaining months
0031509c 274 (if (and (cdr (cdr list));; at least two more months...
0031509c
ER
275 (<= (car (cdr (cdr list)))
276 (chinese-zodiac-sign-on-or-after (car (cdr list)))))
67d80173 277 ;; Next month is a leap month
00e3e480 278 (cons (list (+ start 0.5) (car (cdr list)))
67d80173
ER
279 (number-chinese-months (cdr (cdr list)) (1+ start)))
280 ;; Next month is not a leap month
0031509c
ER
281 (number-chinese-months (cdr list) (1+ start)))))))
282
283(defun chinese-month-list (start end)
284 "List of starting dates of Chinese months from START to END."
285 (if (<= start end)
286 (let ((new-moon (chinese-new-moon-on-or-after start)))
287 (if (<= new-moon end)
00e3e480
ER
288 (cons new-moon
289 (chinese-month-list (1+ new-moon) end))))))
0031509c 290
0031509c
ER
291(defun compute-chinese-year (y)
292 "Compute the structure of the Chinese year for Gregorian year Y.
00e3e480 293The result is a list of pairs (i d), where month i begins on absolute date d,
0031509c
ER
294of the Chinese months from the Chinese month following the solstice in
295Gregorian year Y-1 to the Chinese month of the solstice of Gregorian year Y."
296 (let* ((next-solstice (chinese-zodiac-sign-on-or-after
297 (calendar-absolute-from-gregorian
298 (list 12 15 y))))
299 (list (chinese-month-list (1+ (chinese-zodiac-sign-on-or-after
300 (calendar-absolute-from-gregorian
301 (list 12 15 (1- y)))))
67d80173
ER
302 next-solstice))
303 (next-sign (chinese-zodiac-sign-on-or-after (car list))))
0031509c
ER
304 (if (= (length list) 12)
305 ;; No room for a leap month, just number them 12, 1, 2, ..., 11
00e3e480 306 (cons (list 12 (car list))
67d80173
ER
307 (number-chinese-months (cdr list) 1))
308 ;; Now we can assign numbers to the list for y
309 ;; The first month or two are special
310 (if (or (> (car list) next-sign) (>= next-sign (car (cdr list))))
311 ;; First month on list is a leap month, second is not
00e3e480
ER
312 (append (list (list 11.5 (car list))
313 (list 12 (car (cdr list))))
67d80173
ER
314 (number-chinese-months (cdr (cdr list)) 1))
315 ;; First month on list is not a leap month
00e3e480 316 (append (list (list 12 (car list)))
67d80173
ER
317 (if (>= (chinese-zodiac-sign-on-or-after (car (cdr list)))
318 (car (cdr (cdr list))))
319 ;; Second month on list is a leap month
00e3e480 320 (cons (list 12.5 (car (cdr list)))
67d80173
ER
321 (number-chinese-months (cdr (cdr list)) 1))
322 ;; Second month on list is not a leap month
323 (number-chinese-months (cdr list) 1)))))))
0031509c 324
0808d911
ER
325(defun calendar-absolute-from-chinese (date)
326 "The number of days elapsed between the Gregorian date 12/31/1 BC and DATE.
327The Gregorian date Sunday, December 31, 1 BC is imaginary."
328 (let* ((cycle (car date))
329 (year (car (cdr date)))
330 (month (car (cdr (cdr date))))
331 (day (car (cdr (cdr (cdr date)))))
332 (g-year (+ (* (1- cycle) 60);; years in prior cycles
0031509c
ER
333 (1- year) ;; prior years this cycle
334 -2636))) ;; years before absolute date 0
335 (+ (1- day);; prior days this month
00e3e480
ER
336 (car
337 (cdr ;; absolute date of start of this month
338 (assoc month (append (memq (assoc 1 (chinese-year g-year))
339 (chinese-year g-year))
340 (chinese-year (1+ g-year)))))))))
0808d911
ER
341
342(defun calendar-chinese-from-absolute (date)
343 "Compute Chinese date (cycle year month day) corresponding to absolute DATE.
344The absolute date is the number of days elapsed since the (imaginary)
345Gregorian date Sunday, December 31, 1 BC."
0031509c
ER
346 (let* ((g-year (extract-calendar-year
347 (calendar-gregorian-from-absolute date)))
00e3e480 348 (c-year (+ g-year 2695))
0031509c
ER
349 (list (append (chinese-year (1- g-year))
350 (chinese-year g-year)
351 (chinese-year (1+ g-year)))))
00e3e480
ER
352 (while (<= (car (cdr (car (cdr list)))) date)
353 ;; the first month on the list is in Chinese year c-year
354 ;; date is on or after start of second month on list...
0031509c 355 (if (= 1 (car (car (cdr list))))
00e3e480
ER
356 ;; second month on list is a new Chinese year
357 (setq c-year (1+ c-year)))
358 ;; ...so first month on list is of no interest
0031509c 359 (setq list (cdr list)))
00e3e480
ER
360 (list (/ (1- c-year) 60)
361 (calendar-mod c-year 60)
0031509c 362 (car (car list))
00e3e480 363 (1+ (- date (car (cdr (car list))))))))
0808d911
ER
364
365(defun holiday-chinese-new-year ()
366 "Date of Chinese New Year."
367 (let ((m displayed-month)
368 (y displayed-year))
369 (increment-calendar-month m y 1)
370 (if (< m 5)
371 (let ((chinese-new-year
372 (calendar-gregorian-from-absolute
00e3e480 373 (car (cdr (assoc 1 (chinese-year y)))))))
0808d911 374 (if (calendar-date-is-visible-p chinese-new-year)
b4cb70c4
ER
375 (list
376 (list chinese-new-year
377 (format "Chinese New Year (%s)"
ba2a1fb0 378 (calendar-chinese-sexagesimal-name (+ y 57))))))))))
0808d911
ER
379
380(defun calendar-chinese-date-string (&optional date)
381 "String of Chinese date of Gregorian DATE.
382Defaults to today's date if DATE is not given."
383 (let* ((a-date (calendar-absolute-from-gregorian
384 (or date (calendar-current-date))))
385 (c-date (calendar-chinese-from-absolute a-date))
386 (cycle (car c-date))
387 (year (car (cdr c-date)))
388 (month (car (cdr (cdr c-date))))
389 (day (car (cdr (cdr (cdr c-date)))))
390 (this-month (calendar-absolute-from-chinese
391 (list cycle year month 1)))
392 (next-month (calendar-absolute-from-chinese
67d80173
ER
393 (list (if (= year 60) (1+ cycle) cycle)
394 (if (= (floor month) 12) (1+ year) year)
395 (calendar-mod (1+ (floor month)) 12)
396 1)))
0031509c 397 (m-cycle (% (+ (* year 5) (floor month)) 60)))
b4cb70c4 398 (format "Cycle %s, year %s (%s), %smonth %s%s, day %s (%s)"
0808d911 399 cycle
ba2a1fb0 400 year (calendar-chinese-sexagesimal-name year)
0808d911
ER
401 (if (not (integerp month))
402 "second "
403 (if (< 30 (- next-month this-month))
404 "first "
405 ""))
0031509c 406 (floor month)
b4cb70c4 407 (if (integerp month)
ba2a1fb0 408 (format " (%s)" (calendar-chinese-sexagesimal-name
cc6e0522 409 (+ (* 12 year) month 50)))
b4cb70c4 410 "")
ba2a1fb0 411 day (calendar-chinese-sexagesimal-name (+ a-date 15)))))
b4cb70c4 412
ba2a1fb0
PE
413(defun calendar-chinese-sexagesimal-name (n)
414 "The N-th name of the Chinese sexagesimal cycle.
b4cb70c4
ER
415N congruent to 1 gives the first name, N congruent to 2 gives the second name,
416..., N congruent to 60 gives the sixtieth name."
417 (format "%s-%s"
418 (aref chinese-calendar-celestial-stem (% (1- n) 10))
419 (aref chinese-calendar-terrestrial-branch (% (1- n) 12))))
0808d911
ER
420
421(defun calendar-print-chinese-date ()
422 "Show the Chinese date equivalents of date."
423 (interactive)
424 (message "Computing Chinese date...")
425 (message "Chinese date: %s"
426 (calendar-chinese-date-string (calendar-cursor-to-date t))))
427
428(defun calendar-goto-chinese-date (date &optional noecho)
429 "Move cursor to Chinese date DATE.
430Echo Chinese date unless NOECHO is t."
431 (interactive
432 (let* ((c (calendar-chinese-from-absolute
433 (calendar-absolute-from-gregorian
434 (calendar-current-date))))
435 (cycle (calendar-read
0031509c 436 "Chinese calendar cycle number (>44): "
0808d911
ER
437 '(lambda (x) (> x 44))
438 (int-to-string (car c))))
439 (year (calendar-read
0031509c 440 "Year in Chinese cycle (1..60): "
0808d911
ER
441 '(lambda (x) (and (<= 1 x) (<= x 60)))
442 (int-to-string (car (cdr c)))))
0031509c
ER
443 (month-list (make-chinese-month-assoc-list
444 (chinese-months cycle year)))
445 (month (cdr (assoc
446 (completing-read "Chinese calendar month: "
447 month-list nil t)
448 month-list)))
449 (last (if (= month
450 (car (cdr (cdr
451 (calendar-chinese-from-absolute
452 (+ 29
453 (calendar-absolute-from-chinese
454 (list cycle year month 1))))))))
455 30
456 29))
457 (day (calendar-read
458 (format "Chinese calendar day (1-%d): " last)
459 '(lambda (x) (and (<= 1 x) (<= x last))))))
0808d911
ER
460 (list (list cycle year month day))))
461 (calendar-goto-date (calendar-gregorian-from-absolute
462 (calendar-absolute-from-chinese date)))
463 (or noecho (calendar-print-chinese-date)))
464
0031509c
ER
465(defun chinese-months (c y)
466 "A list of the months in cycle C, year Y of the Chinese calendar."
467 (let* ((l (memq 1 (append
468 (mapcar '(lambda (x)
469 (car x))
470 (chinese-year (extract-calendar-year
471 (calendar-gregorian-from-absolute
472 (calendar-absolute-from-chinese
473 (list c y 1 1))))))
474 (mapcar '(lambda (x)
475 (if (> (car x) 11) (car x)))
476 (chinese-year (extract-calendar-year
477 (calendar-gregorian-from-absolute
478 (calendar-absolute-from-chinese
479 (list (if (= y 60) (1+ c) c)
480 (if (= y 60) 1 y)
481 1 1))))))))))
482 l))
483
484(defun make-chinese-month-assoc-list (l)
485 "Make list of months L into an assoc list."
486 (if (and l (car l))
487 (if (and (cdr l) (car (cdr l)))
488 (if (= (car l) (floor (car (cdr l))))
489 (append
490 (list (cons (format "%s (first)" (car l)) (car l))
491 (cons (format "%s (second)" (car l)) (car (cdr l))))
492 (make-chinese-month-assoc-list (cdr (cdr l))))
493 (append
494 (list (cons (int-to-string (car l)) (car l)))
495 (make-chinese-month-assoc-list (cdr l))))
496 (list (cons (int-to-string (car l)) (car l))))))
497
0808d911
ER
498(defun diary-chinese-date ()
499 "Chinese calendar equivalent of date diary entry."
500 (format "Chinese date: %s" (calendar-chinese-date-string date)))
501
c86b6d44 502(provide 'cal-china)
0808d911 503
6b61353c 504;;; arch-tag: 7e5b7e0d-676c-47e3-8696-93e7ea0ab644
c86b6d44 505;;; cal-china.el ends here