Small url-cache fix.
[bpt/emacs.git] / test / ChangeLog
index 2275e54..feae114 100644 (file)
@@ -1,3 +1,199 @@
+2010-09-20  Stefan Monnier  <monnier@iro.umontreal.ca>
+
+       * indent/prolog.prolog: Use normal spacing around !.
+
+2010-09-18  Stefan Monnier  <monnier@iro.umontreal.ca>
+
+       * indent/octave.m: Remove one more `fixindent'.  Use `end'.
+
+2010-09-10  Stefan Monnier  <monnier@iro.umontreal.ca>
+
+       * indent/octave.m: Remove some `fixindent' not needed any more.
+
+2010-08-30  Stefan Monnier  <monnier@iro.umontreal.ca>
+
+       * indent/octave.m: New file.
+
+2010-08-08  Ulf Jasper  <ulf.jasper@web.de>
+
+       * icalendar-testsuite.el (icalendar-testsuite-run): Add internal tests.
+       (icalendar-testsuite--trim, icalendar-testsuite--compare-strings)
+       (icalendar-testsuite--run-internal-tests): New.
+       (icalendar-testsuite--test-convert-ordinary-to-ical)
+       (icalendar-testsuite--test-convert-block-to-ical)
+       (icalendar-testsuite--test-convert-anniversary-to-ical)
+       (icalendar-testsuite--test-parse-vtimezone)
+       (icalendar-testsuite--do-test-export): Code formatting.
+       (icalendar-testsuite--test-parse-vtimezone): Doc fix.
+       (icalendar-testsuite--do-test-import)
+       (icalendar-testsuite--do-test-cycle):
+       Use icalendar-testsuite--compare-strings
+       (icalendar-testsuite--run-import-tests): Comment added.
+       (icalendar-testsuite--run-import-tests)
+       (icalendar-testsuite--run-real-world-tests): Fix expected results.
+
+2010-06-25  Chong Yidong  <cyd@stupidchicken.com>
+
+       * redisplay-testsuite.el (test-redisplay-3): New test.
+
+2010-06-11  Chong Yidong  <cyd@stupidchicken.com>
+
+       * comint-testsuite.el: New file.
+
+2010-06-02  Stefan Monnier  <monnier@iro.umontreal.ca>
+
+       * indent: New dir.
+
+2010-05-07  Chong Yidong  <cyd@stupidchicken.com>
+
+       * Version 23.2 released.
+
+2010-03-29  Chong Yidong  <cyd@stupidchicken.com>
+
+       * cedet/semantic-ia-utest.el
+       (semantic-symref-test-count-hits-in-tag): Add function, from
+       semantic-test.el.
+
+       * cedet/tests/test.cpp:
+       * cedet/tests/test.py:
+       * cedet/tests/teststruct.cpp:
+       * cedet/tests/testtemplates.cpp:
+       * cedet/tests/testusing.cpp:
+       * cedet/tests/scopetest.cpp:
+       * cedet/tests/scopetest.java: Files deleted.
+
+       * cedet/tests/test.make:
+       * cedet/tests/test.c:
+       * cedet/tests/testjavacomp.java:
+       * cedet/tests/testspp.c:
+       * cedet/tests/testsppreplace.c:
+       * cedet/tests/testsppreplaced.c:
+       * cedet/tests/testsubclass.cpp:
+       * cedet/tests/testsubclass.hh:
+       * cedet/tests/testtypedefs.cpp:
+       * cedet/tests/testvarnames.c:
+       * cedet/tests/test.el:
+       * cedet/tests/testdoublens.cpp:
+       * cedet/tests/testdoublens.hpp: Add copyright header.
+
+       * cedet/semantic-tests.el (semanticdb-test-gnu-global):
+       Remove reference to deleted files.
+
+2010-03-30  Juri Linkov  <juri@jurta.org>
+
+       * occur-testsuite.el (occur-tests): Add tests for context lines.
+
+2010-03-23  Juri Linkov  <juri@jurta.org>
+
+       * occur-testsuite.el: New file.
+
+2010-03-10  Chong Yidong  <cyd@stupidchicken.com>
+
+       * Branch for 23.2.
+
+2010-02-19  Ulf Jasper  <ulf.jasper@web.de>
+
+       * icalendar-testsuite.el
+       (icalendar-testsuite--run-function-tests): Added new tests.
+       (icalendar-testsuite--test-diarytime-to-isotime): Added another
+       testcase.
+       (icalendar-testsuite--test-convert-ordinary-to-ical): New.
+       (icalendar-testsuite--test-convert-weekly-to-ical): New.
+       (icalendar-testsuite--test-convert-yearly-to-ical): New.
+       (icalendar-testsuite--test-convert-block-to-ical): New.
+       (icalendar-testsuite--test-convert-cyclic-to-ical): New.
+       (icalendar-testsuite--test-convert-anniversary-to-ical): New.
+
+2010-01-18  Juanma Barranquero  <lekktu@gmail.com>
+
+       * cedet/semantic-tests.el (semanticdb-test-gnu-global)
+       (semantic-lex-test-full-depth, semantic-symref-test-count-hits-in-tag):
+       Fix typos in docstrings and error messages.
+       (semanticdb-ebrowse-run-tests): Fix typos in error messages.
+
+2010-01-14  Juanma Barranquero  <lekktu@gmail.com>
+
+       * cedet/cedet-utests.el (cedet-utest-log-shutdown, pulse-test):
+       * cedet/semantic-ia-utest.el (semantic-ia-utest-error-log-list)
+       (semantic-ia-utest-buffer-refs): Fix typos in docstrings.
+
+2009-12-18  Ulf Jasper  <ulf.jasper@web.de>
+
+       * icalendar-testsuite.el
+       (icalendar-testsuite--run-function-tests): Added
+       icalendar-testsuite--test-parse-vtimezone.
+       (icalendar-testsuite--test-parse-vtimezone): New.
+       (icalendar-testsuite--do-test-cycle): Doc changes.
+       (icalendar-testsuite--run-real-world-tests): Removed trailing
+       whitespace -- see change of icalendar--add-diary-entry in
+       icalendar.el.
+       (icalendar-testsuite--run-cycle-tests): Re-enabled all tests.
+
+2009-09-30  Glenn Morris  <rgm@gnu.org>
+
+       * cedet/semantic-utest-c.el: Relicense under GPLv3+.
+
+2009-06-26  Eric Ludlam  <zappo@gnu.org>
+
+       * cedet/*: New unit tests, from CEDET repository.
+
+2009-06-26  Chong Yidong  <cyd@stupidchicken.com>
+
+       * redisplay-testsuite.el: New file.
+
+2009-06-21  Chong Yidong  <cyd@stupidchicken.com>
+
+       * Branch for 23.1.
+
+2009-01-25  Ulf Jasper  <ulf.jasper@web.de>
+
+       * icalendar-testsuite.el
+       (icalendar-testsuite--run-function-tests): Added
+       icalendar-testsuite--test-diarytime-to-isotime.
+       (icalendar-testsuite--test-parse-summary-and-rest): Adjusted to
+       recent icalendar fixes.
+       (icalendar-testsuite--test-diarytime-to-isotime): New.
+       (icalendar-testsuite--test-create-uid): Adjusted to recent
+       icalendar changes.
+
+2008-11-30  Shigeru Fukaya  <shigeru.fukaya@gmail.com>
+
+       * bytecomp-testsuite.el: New file.
+
+2008-10-31  Ulf Jasper  <ulf.jasper@web.de>
+
+       * icalendar-testsuite.el (icalendar-testsuite--run-function-tests):
+       Added `icalendar-testsuite--test-create-uid'.
+       (icalendar-testsuite--test-create-uid): New.
+
+2008-06-14  Ulf Jasper  <ulf.jasper@web.de>
+
+       * newsticker-testsuite.el: New file.
+
+2008-05-24  Ulf Jasper  <ulf.jasper@web.de>
+
+       * icalendar-testsuite.el (icalendar-testsuite--run-function-tests):
+       Add icalendar-testsuite--test-datestring-to-isodate,
+       icalendar-testsuite--test-datetime-to-diary-date, and
+       icalendar-testsuite--test-calendar-style.
+       (icalendar-testsuite--test-format-ical-event):
+       (icalendar-testsuite--test-parse-summary-and-rest):
+       Doc fix.  Remove european-calendar-style.
+       (icalendar-testsuite--get-ical-event): Doc fix.
+       (icalendar-testsuite--test-first-weekday-of-year):
+       (icalendar-testsuite--run-cycle-tests): Add doc string.
+       (icalendar-testsuite--test-datestring-to-isodate):
+       (icalendar-testsuite--test-datetime-to-diary-date):
+       (icalendar-testsuite--test-calendar-style): New functions.
+       (icalendar-testsuite--test-export): Handle iso date style.
+       New arg INPUT-ISO.  Use calendar-date-style.
+       (icalendar-testsuite--test-import): Handle iso date style.
+       New arg EXPECTED-ISO.  Use calendar-date-style.
+       (icalendar-testsuite--test-cycle): Handle iso date style.
+       (icalendar-testsuite--run-import-tests):
+       (icalendar-testsuite--run-export-tests):
+       (icalendar-testsuite--run-real-world-tests): Add iso style tests.
+
 2008-02-29  Glenn Morris  <rgm@gnu.org>
 
        * README: New file.
        * icalendar-testsuite.el: New file.
 
 ;; Local Variables:
-;; coding: iso-2022-7bit
+;; coding: utf-8
 ;; add-log-time-zone-rule: t
 ;; End:
 
-    Copyright (C) 2008  Free Software Foundation, Inc.
+    Copyright (C) 2008, 2009, 2010  Free Software Foundation, Inc.
 
   This file is part of GNU Emacs.
 
-  GNU Emacs is free software; you can redistribute it and/or modify
+  GNU Emacs is free software: you can redistribute it and/or modify
   it under the terms of the GNU General Public License as published by
-  the Free Software Foundation; either version 3, or (at your option)
-  any later version.
+  the Free Software Foundation, either version 3 of the License, or
+  (at your option) any later version.
 
   GNU Emacs is distributed in the hope that it will be useful,
   but WITHOUT ANY WARRANTY; without even the implied warranty of
   GNU General Public License for more details.
 
   You should have received a copy of the GNU General Public License
-  along with GNU Emacs; see the file COPYING.  If not, write to the
-  Free Software Foundation, Inc., 51 Franklin Street, Fifth Floor,
-  Boston, MA 02110-1301, USA.
+  along with GNU Emacs.  If not, see <http://www.gnu.org/licenses/>.
 
 ;;; arch-tag: 6f0d1c86-c141-46da-b387-cf17e38c7bf7